Vancouver B.C., November 12, 2025 – TheNewswire - TERRA CLEAN ENERGY CORP. (“ Terra ” or the “ Company ”) (CSE: TCEC, OTCQB: TCEFF , FSE: C 9O0) , is pleased to announce that, further to its press release dated September 24, 2025, the Company has issued a total of 750,000 common shares to the current property owners of mining assets located in Emery County, Utah. The initial share issuances are in connection with agreements to earn interests in each of the Wheel Anne Claims and the Green Vein Mesa Claims (complete details of the earn-in requirements can be found in the September 24, 2025 press release). In preparation for a drilling program, a site visit and sampling program will be conducted within the next two weeks. Samples will be collected along the mineralized contact between the Triassic aged Moenkopi and overlying Chinle formations with priority given to the vicinity of historical sample locations and mine workings. Sampling will consist of both radiometric assays using a handheld spectrometer and select rock samples for geochemical assay analysis. Historical mine workings will be accurately located and reconciled with historical maps and records of mine workings so an effective drill program can be planned for early 2026. It is anticipated that this preparatory program will take up to a week to complete.