Offshore wind economics under pressure: Industry-wide cost inflation (30-40% since 2020), supply chain bottlenecks, and rising interest rates have compressed project IRRs below target thresholds, forcing developers to renegotiate PPAs or cancel projects (US Northeast markets particularly affected)
Regulatory and political risk: Dependence on government subsidies (CfDs, ITCs, ORECs) creates policy uncertainty; permitting delays (US BOEM approvals taking 4-6 years), grid connection queue backlogs, and potential subsidy reductions threaten pipeline execution
Technology and operational risks: Turbine reliability issues (Siemens Gamesa quality problems), cable failures, and foundation design challenges in deeper waters increase O&M costs and reduce availability factors below 95% targets
Intensifying competition from integrated utilities (RWE, Iberdrola, SSE) and oil majors (BP, Shell, TotalEnergies) entering offshore wind with lower cost of capital and balance sheet scale, compressing auction prices and development margins
Chinese turbine manufacturers (Goldwind, Envision) and EPC contractors offering 20-30% cost advantages, potentially disrupting Western supply chains and threatening Ørsted's vendor relationships with Siemens Gamesa and Vestas
Elevated capex burn: $52.7B TTM capex against $22.2B operating cash flow creates -$30.5B free cash flow, requiring continuous capital markets access; construction delays or cost overruns could strain liquidity despite 1.94x current ratio
Asset impairment risk: Negative gross margins suggest recent write-downs on development projects (likely US portfolio); further impairments possible if power price assumptions or project economics deteriorate, impacting equity value and credit metrics
StructuralCompetitiveBalance Sheet