Operator:
Hello, everyone. Thank you for joining us, and welcome to the Barrick Third Quarter 26 Results. After today's prepared remarks, we will host a question-and-answer session. If you would like to ask a question, please press *1 to raise your hand. To withdraw your question, press *1 again. I will now hand the conference over to Cleveland Dodge Rueckert, Head of Investor Relations. Please go ahead.
Cleveland Dodge Rueckert:
Thank you, and good morning, everyone. We hope you have had an opportunity to review the press release we issued before market opened this morning. This presentation deck is also now available to download on our website. Presenting our results today are Mark F. Hill, Barrick's president and CEO, Sebastiaan Bock, CEO of Barrick International, which we previously referred to as Barrick rest of world, and Hongyu Cai, senior EVP and CFO. Other members of Barrick's management team will be available after our prepared remarks for Q&A. Before we begin, please note that we will be making forward-looking statements. This slide includes a summary of the significant risks and factors that could affect Barrick's future performance and our ability to deliver on those forward-looking statements. This material is also available on our website. I will now hand over to Mark.
Mark F. Hill:
Thanks, Cleve. We had our fourth quarter in a row with improved safety and excellent operating and financial results. Once again, we delivered against all 4 of our priorities. We continue to focus on safety, which remains our #1 priority. We delivered higher gold production than last quarter and continue to manage our costs. That allowed us to capture the benefits of high metal prices and deliver strong financial results. We had adjusted net earnings of $0.82 per share and consolidated adjusted EBITDA of $3.5 billion and consolidated free cash flow of $1.2 billion As we announced last quarter, we have restructured the management of 4 mile project into MGM, has already produced significant synergies. On the growth projects, we continue to advance the PV resettlement and tailings expansion and Lumwana continues to be on track and on budget. Finally, we expect to complete the IPR of our North Gold assets by the end of this year or early next year, subject to market conditions and regulatory review. So as I said, safety is our #1 priority, safe and healthy every day. Q3, our leaders continued to get out in the field to identify and manage risks, conducted over 24,000 critical control verifications. A recordable injury rate decreased quarter on quarter from 0.7 to 0.71. We are also working hard to reduce high potential incidents. So turning to our Q3 highlights, we delivered 816,000 ounces of gold, As we flagged last quarter, gold production was higher in Q3. The strong ramp up of Goldrush Underground and Loulo-Gounkoto more than offset the weather disruptions at Veladero and Porgera. Quarterly copper production was 50,000 tons, which Sebastiaan will provide more details on shortly. We continue to manage our gold costs. While we are seeing pressures in Africa from fuel, other consumable costs and foreign exchange, we expect to remain within our full year guidance range. Our adjusted net earnings of $0.82 per share is up 41% year over year Our attributable adjusted EBITDA is up over 20%. Our year to date capital returns of $3.2 billion are double last year's We also on track to deliver full year production guidance and we expect to further extend our track record of strong operational execution. So in North America, we had another increase in production this quarter with almost 500,000 ounces of gold with MGM and PV generating 67%, 72% EBITDA margins respectively. We saw record throughput at the Gold Quarry roaster We progressed the ramp up of Goldrush Underground and Mined Record Tons From Turquoise Ridge Underground. Gold production from PV was softer in the third quarter due to planned autoclave maintenance. Also in North America, we continue to evaluate a number of growth opportunities, At MGM, we are assessing options to optimize infrastructure including new processing capacity at Cortez and rail infrastructure, which could drive a step change in production over the next decade. At Cortez, we are advancing drilling along 1 of the most prospective corridors in Nevada down the Goldrush trend. And at Martin, we turned our focus to drilling out Greater Leeville, We are also looking at optimizing process capacity which could extend open pit life well beyond 2020. Turning to Pueblo Viejo. The resettlement and advancement of the TSF construction continues on schedule, We have 99% of the resettlement packages accepted, and have resettled more than 97% of the families. We continue to advance the engineering work for the addition of a third flotation train, which will deliver improvements to recovery beyond 2030. And we expect to share more information regarding that work in PV with our upcoming IPO filings. So with that, I will turn it over to Sebastiaan to discuss the performance of Barrick International.
Sebastiaan Bock:
Thanks, Mark. Thank you, Mark, and good morning, everyone. Barrick International produced 319,000 ounces in the third quarter, up 6% on Q2. With strong performance at Loulo-Gounkoto, Kibali, and Bulyanhulu. More than offsetting weather disruptions at Veladero and Porgera. The increase came from 2 places, Loulo-Gounkoto continued to perform well, up 16% on higher throughput and grade, with mining and processing consistently running ahead of the original restart plan. And Kibali up 20% delivered its highest quarterly production since Q4 2023, as the underground brought more ore at higher grades. Moving to Tanzania, Bulyanhulu stepped up again as the Upper West development resulted in greater mining flexibility. North Mara was up on the quarter despite an extended plant shutdown and some power instability. Veladero and Porgera were affected by El Nino weather events. Severe winter storm suspended operations at Veladero on several occasions. While drought related water shortages at Porgera limited plant operating rates. We have seen these conditions continue into early Q4. We manage Barrick International as a portfolio, and the performance across the rest of the operations keep us on track for our full year gold production guidance. On costs, higher volumes at Kibali and Bulyanhulu brought unit costs down. Veladero, Porgera, and North Mara went the other way. With impacts from the storms adding to Veladero's costs. Royalties and fuel remain the main pressures year to date. Despite that, Barrick International generated over $800 million of attributable adjusted EBITDA from the gold operations in the quarter, with an adjusted EBITDA margin of 59%. Moving to copper. Production remains on track for full year guidance. We produced 50,000 tons in the quarter with Lumwana completing a planned mill reline in late September, which sets us up for a clean run through the fourth quarter. Our other copper operations were flat on a combined basis with higher grades and recoveries at Gibraltar Head offsetting lower throughput and grades at Zaldivar. Costs were higher in the quarter driven mainly by diesel prices, local currency appreciation, higher royalties on the stronger copper price, and some additional waste stripping on top. For the full year, we expect our copper costs to be around the top end of the range. Given the same diesel and currency pressures. The Limuana expansion will take production to 240,000 tons a year with a mine life of more than 30 years, and it remains on track for first copper from the expansion at the end of Q1 28. Since the start of the project, we have spent $795 million on the expansion, and total expected project capital remains on target at $2 billion Procurement of all major long lead equipment is complete. The mill building, which sits on our critical path, is scheduled for completion in Q4. To close, Q3 shows the portfolio delivering where we control the variables and doing what we can mitigate the external pressures on costs. We remain on track to deliver full year production in line with guidance for both gold and copper. With that, I will hand over to Hongyu.
Hongyu Cai:
Thank you, Sebastiaan, and good morning, everyone. We produced a strong set of financial results this quarter, with solid operational execution allowing us to capture more of the favorable gold and copper prices. These more than offset the increasing cost pressures we faced. Compared to last year's Q3 results, we delivered a substantial increase in earnings. Highlighting our leverage to rising prices and robust operating cash flow. Adjusted net earnings rose 37% year-on-year. And attributable adjusted EBITDA increased 22%. Operating cash flow was in line with last year. And we stepped up investments in our growth options across the portfolio. This includes executing on the Lumwana expansion project increasing stripping at Lulu, and developing MGM optionality. Free cash flow was strong at $1.2 billion, with $154 million of additional growth related CapEx compared to this time last year. We closed Q3 with $900 million of net cash on the balance sheet, up $586 million over prior year. Despite higher returns to shareholders, still leaving us some flexibility to invest in our future growth opportunities. A disciplined approach to capital allocation is a top priority, particularly when the business is generating significant cash. We have a clear framework for deploying capital. Our first priority is balance sheet strength. With $900 million of net cash, and an undrawn $3 billion revolving credit facility, and no meaningful debt due until 2033, we are in a strong position. Our second priority is sustaining the business and earnings accretive growth. Lumana and MGM optimization are 2 clear examples where we are deploying capital into low risk brownfield opportunities that we believe will generate superior returns. Our third priority is returning cash to shareholders Our new dividend policy implemented earlier this year prioritizes our quarterly base dividend of $0.175 per quarter topped up at year end to target a total payout of 50% of attributable free cash flow. This quarter, we completed $800 million of share buybacks and we continue to return excess cash to shareholders. Since 2021, Barrick has returned $10.4 billion to shareholders. And this year, we are set to deliver record annual returns with $3.2 billion returned so far. With that, I will turn the call back over to Mark.
Mark F. Hill:
Okay. Thank you, Hongyu. So, for 2026, production and cost guidance remain unchanged. As we round out the year, we expect the fourth quarter gold production to be slightly higher than Q3. We expect copper production to also increase as we process material stockpile during the quarter at Lumwana. We also expect to remain within our full year guidance for costs. So in conclusion, for the fourth quarter in a row, we have improved our safety although we acknowledge there is more work to do We delivered on our production and cost, we advanced our growth projects on time and on budget, and we advanced our North America IPO. So with that, I will hand it back to the moderator for Q&A.
Operator:
Thank you. We will now begin the question-and-answer session. Please limit yourself to 1 question and 1 follow-up. If you would like to ask a question, please press *1 to raise your hand. To withdraw your question, press *1 again. We ask that you pick up your handset when asking a question to allow for optimum sound quality. If you are muted locally, please remember to unmute your device. Please standby while we compile the Q and A roster. Your first question comes from the line of Daniel Major. With UBS. Please go ahead. Your line is now open.
Daniel Major:
Hi, Mark. So thanks so much for the questions. Yeah. Maybe the first something beeped me. Yeah. The first operational question, I mean, it looks, with higher fourth quarter production expected, you are going to be at the upper end of the guidance range. Can you give us any kind of indications around whether we should extrapolate that into 2027 in terms of how the mine plans are shaping up relative to your previous guidance?
Mark F. Hill:
Okay. Thanks, Daniel. Look, we will be around the midpoint or slightly above the guidance for this year, but no, you should not we will come back to you as we do next year with our guidance for 2027, but you should not be extrapolating that going forward.
Daniel Major:
Okay. Thanks. And then yes, maybe the second question, just how you are thinking about CapEx into next year and the projects. I mean, I think, Pueblo Viejo, the recoveries can continue to lag. And I think there is some kind of processing projects there that could be enacted to improve recoveries? Similar, now you have fully consolidated Fourmile, is a significant scope to accelerate CapEx in elements of MGM. So I just wonder if you could kind of give us a directional first look on how you are thinking about that CapEx and the projects you are focusing on into next year?
Mark F. Hill:
So, look, let me. Daniel, let me just a high level, and I am going to hand it over to Sebastiaan and George who can give you a bit more information. But, certainly, at PB, we are looking at what we can do with a third flotation train, but it is still at the engineering stage. So but that will require some capital. And obviously, our other projects are still, as we said, on schedule and on budget, and that will continue next year as well. So maybe, Seb, you could go first and just talk about capital and rest of the world for the next for this year and next year.
Sebastiaan Bock:
I think that the biggest capital driver for Barrick International, of course, next year still remains Lumwana. So I would say a step-up probably from this year, but very much the same kind of run rate because we expect to start commissioning earlier in Q1 28. And then the only other point I would make is we. We will be doing some studies next year. So Kibali we will start with the ARC study. So that will require some capital, but think not very different to what you have been seeing.
Mark F. Hill:
Do you want to comment on North America,
George Joannou:
Thanks, Mark, and thanks, Daniel. I mean, I would add, I mean, in addition to, suppose, the projects that we have already outlined, Daniel, and that you are quite familiar with, yes, we are looking at an expansion in MGM, but those are not items that we expect to lift the capital profile within 2027 specifically. So really, when you look at the projects that we have already disclosed and that we have guided to, it is really those in addition to our sustaining capital, should shape your expectation for next year specifically.
Daniel Major:
Okay. Thanks. Maybe just on the whole subject, Reko Diq. I mean, can you remind us on the kind of care maintenance carry cost, your share? And directionally, how are you thinking about that rate of spend into next year?
Mark F. Hill:
Look, as we have said, you have seen we have adjusted our guidance down, so we have actually reduced the spend this year. Reko Diq. We still active that project still being actively managed. We. As we have said before, we are doing a full review of where we think we should be going with the project. And so that is a multiple work streams we are looking at. And so we expect to be able to give the market some feedback by the middle of next year And so the only thing I would say I would see. Say that the run rate for next year will remain kind of where we are now as we close out on current commitments and, you know, all the social investment that we have been doing. Outside of that, really, as I have said before, know, the middle of next year, we would be able to give you a more. A much clearer picture around that project and how we see that going forward.
Daniel Major:
Okay. Thanks very much, and congrats on a good set of numbers. Thanks, Daniel.
Operator:
Your next question comes from the line of Richard Garchitorena with Barclays. Please go ahead. Your line is now open.
Analyst:
Great. Thanks, and congrats on the quarter. First question, just touching on the production guidance. Just wondering you mentioned Veladero and Porgera issues in the third quarter continuing into the fourth. Is it fair to say on the international side that we should expect better than expected, I guess, on the African operations and then South America is still under pressure. And then on North America, how should we think about the strong production in third quarter? Is that continues in the fourth?
Sebastiaan Bock:
I will start. This is, of course, the first quarter we are running these assets as 1 business unit. But as to the point I have made earlier, and what you have just pointed to is that we will manage the guidance within the portfolio. We have had, as of pointed out, some significant challenges at Veladero We have had 17 days of downtime in this quarter, but we are very comfortable that within the wider portfolio, we will still manage and we will come and at guidance.
Mark F. Hill:
Okay. And, Richard, just on North America, Look. What we have tried to do this year is rather than have this you know, typical production profile where we start off low in Q1 and then we sort of do the ski ramp all the way up to Q4. So whilst North America will have a strong Q4, it is not what we have typically done in the past. We still do our planned maintenance. We still leave our inventory levels so that we can get a more steady state and come into Q1, what I would call normal quarter to quarter. So will be a strong quarter, but we have definitely changed our approach in trying to level out these up and downs and not just finish on a high and then come in Q1 much lower. Great. Thanks for that. And then as a follow-up, maybe if you can just give us an update in terms of the IPO for North America Barrick, you know, what are the next milestones we should look for, and any color you can give there. Thank you. Okay. So on the IPO, so we will file as we said, we are going to file the S-1 this month. And we are also going to attach those technical reports to that. Then. And George, jump in if I misquote this, then the SEC will give us their feedback. And depending on how long that takes, we are still trying to get this done this year. But it may slide into January. I do not know, George, is there anything else? Okay. Great. Thank you. Thanks, Richard.
Operator:
Your next question comes from the line of Anita Soni with CIBC World Markets. Please go ahead. Your line is now open.
Anita Soni:
Hi. Good morning, guys. Thanks for taking my questions. I wanted to focus on PV. I just wanted to understand recovery rates. I think I just wanted to understand the recovery rate profile as it goes forward now. So, is the technical report that was put out in February of this year, I guess, February 27, I am looking at it right now. Is that still valid for a time line on the rate improvements? Is that what we should be using, or is there some modification to the timeline?
Mark F. Hill:
Okay. Thanks, Anita. I will let. Tim, can I hand that over to you? Can you comment on that, please?
Tim Cribb:
Yeah. Sure. Thanks, Mark. Hi, Anita. Look, on the. I think on PV, we will be updating it, as Mark said, when we put out the SK-1.3 thousand reports. Later this month. With the filing. But I think the important thing here is we work towards the engineering of that third train, which we agree will bring benefit and enable us to lift the recovery. Deliver throughput that we have said. So, we are working at that as well as some additional cells, stacked cells or concord cells to improve the mix of feed that goes to the autoclave. So they are really the key drivers to lift that recovery in the long term. The timing for that remains consistent with what was put in the technical report. There will be some changes throughout the feed profile between now and then, and that is really driven by a lot of the test work which the team has been focused on this quarter. We have been doing a lot of trials around how we run the flotation circuit and as well as on the use of reagents So I think that trial work is definitely something you will see in terms of the recovery that you see in conjunction with the maintenance, which Mark mentioned. But I think we are working well towards that and all the work that we have done to date supports the benefit of putting this to training and the fact that it will deliver that recovery step change once it is implemented.
Anita Soni:
Okay. Can you give us some goalposts on what we should be using for that longer term number once this third train is in terms of recovery rate and what we should use in the interim until that until that third train comes in.
Tim Cribb:
Yeah. So look. I think longer term, it remains similar to that. Low to mid-80%. So that is the good guide to use longer term as we get up. What I would suggest is that we will be putting this report out in the near term, and it would make sense to wait and use the numbers from that. But you are seeing some ups and downs between now and that mid to low 80%, and that is primarily a function of the feed material and the blend that we run, which we have also done some work on. So I think it is best to wait and use updated numbers that will come out in that S-1.
Anita Soni:
Okay. that is it for my questions. Thanks.
Mark F. Hill:
Thanks, Anita.
Operator:
Your next question comes from the line of Matthew Murphy with BMO Capital Markets. Please go ahead. Your line is open.
Matthew Murphy:
Hi. Maybe 1 on this s 1. So the technical reports coming out. With that will have updated reserves, resources, projections. Is there anything in there about what Nevada looks like with additional like, roasting or autoclave capacity and anything on 4 mile in there?
Mark F. Hill:
Look, Matthew. The reports are imminent, so you will see what is in them. Obviously, they will not update the reserves and resources. That will be done at the end of the year as a usual timeline. But there. It will give you a better guide as to what is gonna happen at MGM and PV, but I do not really wanna comment until we finalize them. Like I said, they will be out this month anyway.
Matthew Murphy:
Okay. And then just 1 on capital returns. You paid out a little more than your attributable free cash flow this quarter, and you have got this Newmont cash incoming. How do you feel about the current pace? Like, should we look at. Have any of your capital returns so far this year been in anticipation of that $1.5 billion? Or like could we see a bigger capital return in Q4?
Mark F. Hill:
Helen, do you want to comment?
Hongyu Cai:
Hi, Matthew. As stated in our prepared remarks, we do have a holistic framework for our capital return. And that include rewarding our shareholders, but also maintaining a healthy balance sheet and driving our growth. So we take all of that into consideration. And, yes, we will consider the additional CapEx coming in But as of now, our execution is based on our current plan and the current CapEx outlook. We also take into consideration quarter over quarter change of CapEx and the volume change In the average of Q3 versus Q2. But, again, if you talk about the future incoming proceeds, that is not our exercise, you know, in the past 2 quarters. When we do buyback.
Matthew Murphy:
Got it. Okay. Thanks, Hongyu.
Hongyu Cai:
Thank you. Thanks, Matthew.
Operator:
Your next question comes from the line of Tanya Jakusconek with Scotiabank. Please go ahead.
Tanya Jakusconek:
Oh, great. For taking my questions. Just a not so much on the buybacks, but your free cash flow, your payout when you report in February. Should we consider that whole amount could be added to that payout Sorry. The Newmont payment.
Hongyu Cai:
Thank you for the question. So basically, our original definition is a top-up dividend based on 50% attributable free cash flow. And any additional proceeds coming from formal sales and formal went in and also the IPO will be in addition to any top-up we have. And that is pending our final board decision.
Tanya Jakusconek:
Okay. So the board would have to decide on that. Okay. And then maybe, Mark, you have done really well on your improving the health and safety and stabilizing Nevada gold mine. Maybe just talk a little bit about your turnover. Has that improved from the 14%? And sort of what productivity gains are you seeing? now that the platform has stabilized?
Mark F. Hill:
So, look, we have not seen an increase. Thanks, Tanya. We have seen an increase in productivity, in MGM. And Tim actually had a few slides he was showing me. So. Look, Tim, do you want to comment on the productivity and the throughputs and the underground development rates?
Tim Cribb:
Yeah. Thanks, Mark. I think, firstly, just on turnover, Tanya. I mean, it is relatively flat. You have not seen a significant drop, but I would you know, cite the difficulties and the growth that you are seeing in the industry in Nevada, both in terms of gold and other critical minerals. So we are seeing, you know, a bit of movement of people as these other opportunities start up. But I do not think that, you know, it is an alarming trend. And as Mark said, we have been able to deliver on a lot of the productivity. So if you look to the roast which is really important to us with the proportion of that refractory ore coming through. We have been able to run the roasters at higher throughputs this year. I think some of the changes that were made in people earlier in the year and the leadership they have they have provided have really helped. And the same thing at Turquoise Ridge, that underground has really performed and we have also looked at opening up additional fronts there. And I think that growth opportunity to look at expanding both open pit but also the underground, we are recommenced operation of the road header at Turquoise Ridge. So when you combine that all together, giving us the opportunity to add flexibility in terms of where we operate and the development rates are up and the tons are up to go with it.
Tanya Jakusconek:
Okay. And if I could just squeeze 1 in on just how should I be thinking holistically about your cost structure going into 2027. Should, you know, should the exit rate of 2024 bearing obviously the fuel price? Should I be thinking that 3% to 5% inflation on top of a Q4 exit? Would be a reasonable assumption for you?
Mark F. Hill:
Tanya, we are still working through this. Look, I will say that as you have seen, right, we have controlled costs well, particularly in North America, costs have been controlled quite well. I mean, the things that are driving rest of the world are obviously things that are outside of our control, which is fuel price, royalties, and foreign exchange. So we are still working through the budgets, and so I have not got a. An update for you. But I would say, you know, we have got our costs well in hand.
Sebastiaan Bock:
I do not know, Seb, whether you want to I think you have covered it, and I think what you are seeing this year you know, we. We are controlling the controllables and might. Mitigating as much as we can, but those pressures are there specifically on the diesel side and some of the foreign exchange challenges we have.
Tanya Jakusconek:
Thank you.
Mark F. Hill:
Thanks, Tanya.
Operator:
Your next question comes from Bennett Moore with JPMorgan. Please go ahead.
Bennett Moore:
Good morning, Mark, Seb, Hongyu. Thank you for taking my questions. At Fourmile, it looks like this year's construction and decline development budget may have been throttled back a bit and the PFS target pushed out a year. So I am wondering if there is any additional color on this front and to what extent new JV agreement maybe played a role here and maybe also to what extent you are kind of realizing synergies so far since that agreement has come to fruition.
Mark F. Hill:
Okay. Thanks, Bennett. Well, look, obviously, since we have done that agreement with Newmont, we have revisited this whole form also. We have combined all the teams and obviously, that gives us a lot more flexibility and it is some synergies. And also, we can access 4 more now from MGM properties like Goldrush. As far as the schedule and going forward, think Tim, you are best placed to comment on that.
Tim Cribb:
Yep. Okay. I think just on the schedule, there is 2 things driving it. As Mark said, it is now it is now bended in and bank. Well, in the process, it is been in and being treated as part of the MGM complex. So that did make some changes to the spend as we adjusted the permitting that was in process to commence the Bullion decline. Now we do expect that this quarter, but that did play an impact in the last quarter in terms of the timing there. The other side of it is that we will see some benefit from you know, sharing of resources and bringing them under that NGM front. So we are redoing the engineering and looking at the ways in which we can now access Fourmile from Goldrush and develop that side of the ore body. That work is in process, and it is something that we will be bringing to this year's Life of Mind plans. And the other thing I would just say is, again, as we have said previously, you will. If over the course of this month as we as we release this s 1 and the filings that come with it, there will be more information around 4 miles. So that is probably the best thing to look at.
Bennett Moore:
Thanks for that, and look forward to the So I guess if I could then turn to the international portfolio In the MD and A, you highlighted some opportunities within the I portfolio and I have also talked about Arc at Kibali. So with the Reko Diq Project Review, Just Wondering How You Kind Of Might Force Stack Or Rank Growth Opportunities Within Your International Portfolio?
Sebastiaan Bock:
I Think it is A Pointed Out, Few Weeks Ago At Denver, we have reviewed this portfolio. We have got a portfolio of long life, high quality gold and copper assets. And we have a significant part of that base sits in South America. And the Tim are working to have a relook at that and see how we actually unlock the value from those and monetize them in some way or form. And so exactly the same with Reko Diq. We will be doing the review, as I said, And by next year, we will look at how. What the best path is forward. And of course Africa kind of remains that operating engine. The Moana expansion is on track. it is We will be doubling that production by 2 when we start getting to 2028. So I think that the real change in focus is gone to look to go back and see what is our embedded growth, what is the where does that quality of that portfolio lie, and how do we unlock that? You very much. Best of luck.
Bennett Moore:
Thanks, Bennett.
Operator:
Your next question comes from the line of Lawson Winder. With B of A Securities. Please go ahead.
Lawson Winder:
Yeah. Thank you, operator. And Mark. Good morning to you and the team, and nice quarter. Could I ask about Lemwana? So it would seem to me that the higher guidance on the unit cash cost would be largely a function of Lumwana given some of the drivers that you cited. So that is the higher currency and then as well as the higher diesel prices. And we saw know, similar statements from some of your peers in Zambia. Curious, though, on the CapEx side, so there has been no change to the $2 billion target for the Lumwana expansion. I mean, I guess to ask the question with what gave you the confidence to hold that budget? And then. and did you see any risks to the CapEx budget just given some of the cost inflations you are seeing on the OpEx side?
Sebastiaan Bock:
I think a big part of that is those are long lead items. So it is already been locked in. Where you do see the pressure, of course, is diesel and freight charges. And so we are managing that. At this point in time, we are comfortable with the $2 billion we are managing within that number.
Lawson Winder:
Okay. that is fantastic news. Thank you, Sebastiaan. And then on the expiration commentary that you included in this result, particularly around MGM. I mean, it. it is really intriguing, and I am hopeful we will get some more information on this as we go forward and possibly with the s 1 filing. But you know, North Crow and Pathfinder, you highlighted some exceptionally high grade, but it. But at North Crow, there were some particularly interesting high grade intercepts. I mean, how quickly could that mineralization enter the resource or a mine plan? And then what existing infrastructure could it utilize Or put another way, I mean, do you have a sense of whether it is oxide single refractive or double refractory? And then and then do you have a sense of how that might fit into the medium or long term production profile?
Mark F. Hill:
Okay. Thanks, Lawson. So look, it is an opportunity actually to talk about exploration So we have completely changed that over the last 12 months because in my view and everyone else's NGM is underexplored. I mean, the fact that we found 4 mile right next to Goldrush seems quite unbelievable after 25 years. So we have unconstrained that budget in MGM and actually this will be a record year for the amount of drilling and money we pour into Brownfields exploration around MGM and the rest of North America. On the actual details for Crow, I do not actually have an answer to that. I do not know whether Tim, you have anything you would add to help Lawson with that question.
Tim Cribb:
Yeah. I do. Thanks, Mark. Hi, Lawson. Look. On that area of Crow and the intercepts that we put forward, we are really focused on that region that sits between Goldrush and Fourmile. So you have Crow and KB in that area, And it is an area where we were developing Goldrush and we had capacity. We are developing 4 mile. Now that the 2 are joined together and you have this ability to access through the Goldrush side, it is a key area of focus. In terms of the ore type, we do not have the metallurgy back on that specific ore, but we expect it to be consistent with what we see through there, is mostly double refractory, potentially some single And in terms of the growth in the feed, I guess that concept is it really underpins the story which we went through at Denver around the additional processing capacity at Cortez. So it is a core piece of that, and as Mark said, that is why we are increasing our spend so that we can define that area and region between the 2 is being vended in.
Lawson Winder:
So very prospective and positive results so far. Okay. Well, that is exciting. I look forward to hearing more. Thank you very much for the color. Thanks, Liz.
Operator:
Your next question comes from the line of Fahad Tariq with Jefferies. Please go ahead.
Fahad Tariq:
Hi. Thanks for taking my question. On the optimized Nevada gold mine infrastructure, can you talk about the timing of that and how are we thinking about CapEx and whether the improvements, whether it is the Cortez processing or the rail, are they all ready to optimize 4 mile or is it is it the other operations as well? Thanks.
Mark F. Hill:
So let me start off and then others can jump in. Look. What we are trying to do is now that everything is rolled into NGM, the idea was. And Tim and the team are going about optimizing the whole of the MGM assets. So we are not looking at them in isolation. So we are trying to work out what is the optimal processing routes for all of the ore. I think 1 of the questions actually that our analysts keep asking is, you know, can we provide a flowchart? So we are actually gonna have that, and we will we will be able to give that to you. But what it shows is it is quite complex. So to optimize that and what new processing capacity and where we need, that is still a bit of a work in progress. And the roaster work is at its early stage. I mean, we have only just awarded the engineering study to Hatch, so that will take some time. And then the rail is obviously the ability to move things around Nevada at a much lower cost, which again will optimize the total the total group of operations rather than just any individual operation.
Tim Cribb:
Tim, again, if you wanna add something to that, And you covered most of it, Mark. Just in terms of the question around, is it just Cortez or is it more broader Again, I will refer you back to the presentation we gave at Denver because once you take an idea of increased processing capacity at Cortez, you free up roast capacity at Martin, and so the expiration of Martin, particularly focusing in that North Leeville area as well as you are increasing potentially the material handling capacities or a shaft or a decline there becomes important because then you are talking additional process capacity at both of the centres. Thanks, Tim.
Fahad Tariq:
Okay. And on the timing, these improvements all come after 2030? Is that the right way to think about it?
Mark F. Hill:
that is the right way to think about it. Yes. Okay. Thank you.
Operator:
Your next question comes from Brian MacArthur with Raymond James. Please go ahead.
Brian MacArthur:
Good morning, and thank you for taking my question. Can I just follow-up a little bit on the last question? So in the s 1, have you had enough time? You have talked a lot about optimizing all the flows, which we have talked about for years. But do you think now you actually have had enough time to figure it out, or should we think about the s 1 is kind of optimization 1, And then as we do more work over the next year, we do optimization 2, which changes what is out there in 2030 because it would strike me a little bit that there is still a lot of information, as you said, from drilling you do not have yet to try and optimize everything perfectly. Is that a fair comment?
Mark F. Hill:
Look, Brian, I think it is a very fair comment. Right? So we have only just done this and you are right. it is highlighted some gaps and things we have to drill off and some. For more information we have to get, but at least it is giving us a road map to actually start identifying those gaps and what we have to do to further optimize the complex. But, yes, you are a 100% correct. Great. Thank you.
Brian MacArthur:
And maybe just 1 other question. I noticed you highlighted the Andean portfolio, and you talked a little bit about that. You know, at El Alto, Norte Abierto and Lama. Is when you talk about review of development options, is that the process to review how you are gonna develop them, or is it just the whole process that we might actually see these things sold going forward?
Mark F. Hill:
Look. it is a process to review the assets. As I stand today and the environment we are today, you know, a lot has changed in the last 10 to 15 years. That said, that does not mean we would necessarily want to develop them. The point is we need to understand the assets better. How do they actually fit into. If you were to develop them today or to try and derive some kind of value from them. So if I talk about going back to South America, it is number 1, it refers to, of course, all the exploration opportunities. The governments are a lot more business friendly in pro mining at the moment. The gold price and commodity prices are a lot higher. We have now got power at Veladero, which we did not have a decade ago, etcetera. So I think it is it is it is more realistic. it is around how do we actually get the most value from those assets and not let them just sit on our reserve and resource statements. Does that answer the question?
Brian MacArthur:
No. Great. Thanks very much for the color. that is very, very helpful. Thank you. Thanks, Brian.
Operator:
Your next question comes from Bob Brackett with Bernstein. Please go ahead.
Analyst:
Good morning. Could we get an update on the starter dam permitting for Pueblo Viejo?
Mark F. Hill:
Sure. Okay. Tim, do you want to give an update?
Tim Cribb:
Yeah. So the. I assume you are referring to Naranjo, the new TSF. But in terms of that, the works advance, we have the initial construction of the walls occurring and we are still depositing into El Llagal. We have a approximately a 6- to 12-month buffer between that changeover when we move to Naranjo in late 29, early 30. But in terms of the permitting, the majority of the permits were saved, there are some permits around road construction and bridges which are ongoing. But they are not impacting the schedule. And as we have done over the past 12 to 18 months, we bring them in as needed. So I think things are on track and the budget for it is also on budget as Mark mentioned. Earlier.
Analyst:
Very clear. Thank you. Thanks, Bob.
Operator:
There are no further questions at this time. I will now turn the call back to Emily for the closing remarks.
Cleveland Dodge Rueckert:
Thank you everyone for joining us today. We look forward to speaking with you again on our next results call in the New Year. Please get in touch with us if you have got any further follow-up questions. Thank you.
Operator: