
Murchison Minerals Announces Assay Results From 2025 Diamond Drill Program At BMK VMS Deposit, All Holes Intersecting Significant Near-surface High-grade VMS Mineralization Including Precious Metals, Grades Up To 5.52% CuEq Or 21.97% ZnEq Including, 208g/t Ag, And 1.43g/t Au
BURLINGTON, ON / ACCESS Newswire / February 4, 2026 / Murchison Minerals Ltd. HIGHLIGHTS Diamond drilling was Phase II of III of the Company's 2025 BMK Exploration Program (the "Program") (See October 2nd, 2025, News Release) at its 100%-owned BMK VMS Project in Saskatchewan, located approximately 175 km northwest of Foran Mining Corporations' Mcllvenna Bay VMS mine development (Figure 1); All holes were drilled at the BMK VMS Deposit (the "Deposit") and intersected significant zinc-copper-lead-silver-gold (Zn-Cu-Pb-Ag-Au) mineralization (within the upper 150 m), testing 550 m of the total 1,100 m strike length of the Deposit (Figure 2); Diamond drilling highlights: BMK25-005 successfully targeted expansion of mineralization along strike to the south of the indicated domain, within in the upper 150 m of the Deposit.


















